Before & After Pictures

Untreated

  Treated

Burra Creek algae blooms before being treated by Hydrosmart   Burra Creek with the algae blooms removed after being treated by Hydrosmart
Township of Burra Creek ( Flinders Ranges )
Algae Removal
 
 
Algae in duck pond, Centennial Park
 
Iron Problems
 
Vineyard dam showing iron rich water oxidizing on contact with air   Hydrosmart treatment prevents the iron oxidizing and breaks down the particles to improve water clarity so the water comes out crystal clear
Vineyard Dam, Virginia with equally high levels of iron and salinity
 
Bucket_B4   Bucket_After
Smithfield Cemetery Dam - bore water with high levels of iron and salinity
 
Descaling
 
Inside the hotel glass washer showing build up of scale and biofilms   The glass washer after treatment by Hydrosmart with a clean healthy environment
Arkaba Hotel's glass washer showing the removal of scale and biofilm
 
Scale build up on elements of the heat exchanger not treated by Hydrosmart   The heat exchanger elements treated by Hydrosmart have no scale formation
Heat exchangers aboard the Norsky & Norstream vessels
 
Holden_B4   Holden_After
Descaling a Humidifier at GMH factory
 
Salinity
 
salinity affected turf patch before treatment   lucious turf growth after treatment
22,000 ppm tds water on paspallum grass in the desert of UAE with growth doubled in height and vigour
 
BHP coalwash plant
Plants grown with high salinity water from a coal mine dam
BHP Peak Downs Qld
 
April 2006 - 15,500 ppm tds bore water - Plantation Equestrian Centre, Dubai
October 2006 Healthy fast paspallum grass growth with low level of pest attack
 
 
Untreated: 793 ppm sodium chloride          Treated: 1,750ppm Sodium Chloride
Strawberries grown in desert sand, Dubai
Treated have more even growth, stronger smell and flavour
 
 
Unblocks Drippers & Improves Plant Growth
 
Lettuce
Hydroponics Trials untreated and treated lettuces
irrigated with high mineral content bore water
 
Wastewater Remediatiion
 
Algae in treated sewage effluent (TSE) in Dubai
 
Thai textile factory
Thai textile factory wastewater before and after 28 hrs treatment
 
Aquaculture
 
Barramundi tank not treated by Hydrosmart (control) with murky polluted water   Barramundi tank treated by Hydrosmart with clear healthy water
Barramundi tanks at Urrbrae Agricultural High School
 
 
Aquaculture - bore water preparation
pH 7.2  TDS 2270  DO 5.9  after 24hrs  pH 7.9  TDS 2070  DO 6.7
Biofilm Removal & Water Clarity
 
UV system with scale, biofilm algae and sludge build up on the tubes   Same UV system after 3 weeks of Hydrosmart treatment with the scale, biofilm, algae etc removed from tubes
U.V. System, Mullana Elderly Citzens Nursing Home
 
 
Swimming pool at Casaluna luxury resort after 10 days of treatment